Name of the Project: Construction of Building B1E and B3A for SCHWING STETTER (INDIA) Private Limited (SSIPL) at SIPCOT Phase-II Cheyyar, Thirvannamalai Dt
Cost of the Project: 27.04 Crores
Plinth Area of the Building: 2,20,000 Sqft
Structure: Ground floor
Architect: ADIDON, Chennai-600 063

Related Posts

RMKV SILKS

Name of the Project: Construction of Stilt + 4 story Residential Apartment at RA Puram, Chennai - 600 028Cost of the Project: 10.00 CroresPlinth Area of the Building: 24,510 SqftStructure: G+4 FloorArchitect: M/s.Khosla Associates, Bangalore

ACADEMY OF MARITIME EDUCATION & TRAINING (AMET)

Name of the Project: Construction of Various Building for Academy of Maritime Education and training at thenpattinamCost of the Project: 54.00 CroresPlinth Area of the Building: 57291 SqftStructure: Ground + 1 FloorArchitect: COS CONSULTANCY SERVICES.,…